Hello experts,
I need your advise on the following issue:
The SFC moves to quarantine area through rework 1 or rework 2 special operations if the NC remains open. Rework operations receive SFC from any operation from the main routing (can be 4 operations on the main routing where NC can be logged).
In quarantine, when NC remains open and operation completed the SFC is scrapped. But the problem is it is always picking a particular operation only on the main routing although I have not assigned any reporting step at quarantine.
What could be the reason for this?
Also if want to pick the last completed operation on main routing from which it has come to quarantine, can this be done through custom script?
Thanks in advance,
K S Srinivas