A couple of others:
1 - I might want to have different selected sets for my UD codes. I can define my 04 inspection type to use selected UD4, inspection type 04001 to use selected set UD4001 and inspection type 04002 to use selected set UD4002, etc etc..
2- I need to use different inspection plans.
Inspection type 89 is defined to use task list usage 5, (maybe same usage as used by 04 inspections).
Inspection type 89A is defined to use task list usage 8.
In this way I can do a manual inspection using my production inspection plan which might not be checking every possible characteristic.
With inspection type 89A the plan with usage 8 has every test that is applicable for the material.
Craig