Hi All,

 

I am trying to configure the availability check for Process orders in such a way that the User should not be able to release the process order in case of missing parts.

 

I have done the needed configurations in the system and they are working fine.

 

But there is still a way the user can bypass this availability check.

Consider below scenario:

 

Suppose I need 10KGs of material X to manufacture a material P.

I have no stock of material X.

Now while releasing the process order, the release is rightly rejected as per the configurations.

But I can now go to the missing parts overview, change the required quantity of Material X to 0 Kg and release the order.

This time the system wont stop me from releasing the order.

And after it is released, i can again change the quantity to 10KGs and save the order and nobody knows as there are very limited or no change documents related to Process orders.

 

How do i prevent this?

Any suggestions??

 