Hi Jith,
Maintain the selection method as 3 -Selection only by production version in the MRP4 view of the material master in ECC side.
Hope this solve this problem.
BR
Thamizh
Hi Jith,
Maintain the selection method as 3 -Selection only by production version in the MRP4 view of the material master in ECC side.
Hope this solve this problem.
BR
Thamizh