Hi,
in TVCPL, you can see two fields
1. Schedule Line Requirement
2. Schedule Line transfer
I hope you are talking about Schedule line transfer
I did some find that field is copied for some document types and not for some
i believe this value is always 151 in standard which is copied from TVCPA
can you do copy control from standard OR-LF and make changes with your document types and check
I believe it is automatically populated and there is no separate configuration required
Please copy your values in VTAL with your document types
thanks,
santosh